Structured cabling / low-voltage contractors
First call. Cable Pro is the package.

Waukesha, Wisconsin · field map
RackLume is the field map for structured cabling shops. A tech in the IDF looks up a jack and sees the switch port, the IP phone on that drop, and the length. When the pull is done, the Fluke PDF sits on the work order and the bill matches the customer PO. You already have LinkWare and QuickBooks. This is the hole between them.
Cable Pro and Electric Pro are $99/mo for the office and $35/mo per field seat. Electric + Cable Pro is $149/$50 — floors, APs, and closet on that rail. A six-person Cable Pro shop is $274/mo. We map the building as a job.
161
of 176
91%
Launch deadline
Plant import, company price book, invoice PDF, first real building. Then a check. No Stripe. 161 of 176 gates closed. Next: First real building — next on the board.
95%of the board is walked
Deadline
Friday, September 25, 2026
Deadline is here.
Who it is for
First call. Cable Pro is the package.
Electric Pro is the same $99/$35 meter as Cable Pro. Panels, not jacks. Uncluttered rail — no floors or APs.
Electric + Cable Pro is $149/mo office and $50/mo per field seat. Floors, APs, and closet on top of the electric rail. One subscription, not two $99s.
Second. Start MSP Basic; flip Cable Pro when they bill the pull.
Later. They want the map. They are not the first check.
Wisconsin shops we already know how to call: Tritech Corp. of America (Waukesha), Brew City PC (Oconomowoc), Kelley Communications, RD Technology, Edge Electric, Kohl, Terminal-Andrae. Not customers yet. Neighbors.
In the closet
Type a cable ID or an extension. Lantern fills closet, panel, switch port, length, and media when that horizontal is in the plant.
IP phone, daisy-chained PC, jack letter. The closet and the directory stop being two lists.
Export Permanent Link from LinkWare. Upload the PDF to the work order. We do not parse LinkWare. We keep the paper with the pull.
Footage, jacks, labor, trip. Customer PO on the work order becomes the PO on the invoice. Net 30. Enlighten does not take a cut.
Packages
MSP if you only map equipment. Billing if you only need the ledger. Advanced if the same people do IT and pulls. Most shops we will call this year are Cable Pro.
Package
$79 /mo office
$25 /mo per field seat
IT bench. Find the jack, set the PC or phone, walk the closet. You do not bill the customer from Lantern.
Recommended
Cable Pro$99 /mo office
$35 /mo per field seat · Extra building $30/mo
The offer. Drops, footage, Fluke PDF, work order, invoice that matches the PO.
Package
$129 /mo office
$45 /mo per field seat
Shops that do both. Plant, equipment, the pull, the cert, and the bill in one nav.
Package
$99 /mo office
$35 /mo per field seat
Electricians. Panels, breaker schedules, which circuit a drop is on, outlet numbers, used vs spare — then the work order and the invoice.
Package
$149 /mo office
$50 /mo per field seat
Electricians who also pull low voltage. Panels and drops, plus floors, closets, APs, and the cable bill. One $149 / $50 meter — not two stacked $99 subscriptions.
Package
$79 /mo office
No field plant seats
Office ledger only. Work orders, PO, invoices, SOP. No closet map.
Two invoices. Never mixed.
Bill 1 · Enlighten → shop
You pay Enlighten Studios for the office, field seats, and extra buildings. QuickBooks or a check — the way you already pay us. If the invoice ages out, we freeze the tenant. The plant file is still yours.
Bill 2 · Shop → your customer
You bill the building owner from the work order. PO, footage, cert, Net 30. That AR is yours. Enlighten does not take a cut and does not sit on that payment.
Plant import
Plant is tenant data, not a demo building we compiled once. Someone has to produce the file — site walk, as-builts, spreadsheet. That is a services job in front of the software. Typical office is $3,500.
Small closet
$1,500
One closet, under ~100 drops, labels you can trust.
Typical office
$3,500
Two to four closets, a real floor plate, as-builts that are mostly true. This is the number we quote from.
Campus / messy plant
$8,000
Five-plus closets, fiction as-builts, or a walk that takes days. Quote before we badge in.
Waukesha
Mike Cobus · Enlighten Studios. A six-person Cable Pro shop is $274/mo ($3,288/yr) plus the import. No card on file. Pay the way you already pay us.