
Waukesha, Wisconsin · what’s new
Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.
Friday, September 18, 2026
this deploy
The last orange accents around switch ports went neutral. Picking a port row on a switch highlights it in white now, and in a closet the PoE pill only lights up on a port that is actually pushing watts.
this deploy
Open a closet and the switch draws the same faceplate Air uses — PoE copper, plain copper, and SFP uplinks. Under the rack there is a new Ports in this cabinet list so you can trace a live drop that has no PoE on it.
Tuesday, September 15, 2026
this deploy
MDF/IDF faceplates and port-to-circuit are checked. Remaining closet work is on /launch: company plant on Find/Lens, floors geometry, walk-sample heatmap, honest Air/Stats, server snaps. No live LDAP or switch scrape this phase.
Wednesday, September 16, 2026
this deploy
A Lens snap now lands on the company plant. The next tech on another phone sees it on the closet. Photos used to sit only on that device.
Tuesday, September 15, 2026
this deploy
Floors now show a hover card with jack, switch port, LDAP, and TDR length. Closet ports carry the same facts. Cameras have a section and cyan pins on the plan. Charge day is Friday, September 25.
Waukesha
Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.