RackLume

Waukesha, Wisconsin · what’s new

What’s new.

Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

411 in the log

Bookmark with ?tag= and ?q= on this URL.

Floors

74 ships · latest Floor plan sits above wall scale

Air

21 ships · latest Air floor chips sit on the plan; Install sits under it

Free edition

22 ships · latest Guide is a step-by-step book for each package

Plant

128 ships · latest Lens shows the floor plan behind the labels

Jobs & billing

17 ships · latest Invoice PDF uses Outfit and an optional shop logo

Electric

4 ships · latest Panel-walk CSV loads a live building electrical plant

Site

123 ships · latest Portal is live on portal.racklume.com

Ops

8 ships · latest Changelog opens by area; the full log stays

Other

14 ships · latest Enlighten admin can compose shop user accounts

Every ship is in one area. Nothing is removed.

Full log

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.