Tuesday, September 22, 2026
Free testers who open Panels or Drops see honest Electric Pro copy and Ask to upgrade. No fake house panel map. Android/iPhone install copy now says not Play Store / not App Store yet. Testers still have to sideload or add the Home Screen icon.
- ●free-residential-tier is Doing 90% — breaker step is the paid ask, not a free schedule. APK and iPhone cards stay open.
- ●Password hashes untouched. Did not touch Make 2D / floor plate.
Friday, September 18, 2026
Account Load writes panels, breakers, and outlets from a shop CSV. Excel TSV works. Panels and Drops read that file. Harborline stays the compiled demo. Password hashes untouched.
- ●electric-plant-import — panel, breaker, outlet, room. POST /api/electric/csv same as the form. Export downloads the loaded walk.
- ●Empty Panels / Drops send the shop to Account. Did not invent a Waukesha street.
Wednesday, September 16, 2026
Harborline Floors now shows CCTV camera locations and electrical drops the same way data jacks already pin. Hover a cyan square or an amber diamond for the path. Electric-only shops still have floors off.
- ●Cyan squares are cameras — hostname, IP, MAC, VLAN, switch port. Floor 2 now has dispatch and hall cameras so the default chip is not empty.
- ●Amber diamonds are electrical drops — panel, breaker, outlet, room, amps. Harborline seed has coordinates. Roof stays on the Drops list (no roof drawing).
- ●Harborline admin and Electric + Cable (both@) see both. Cable-only still sees cameras, not electrical. Did not turn floors on for electric@.
A shop can load a panel walk the same way they load a cabling CSV. Billing shows the package license and three a la carte SKUs. /for-contractors/product is the launch product page.
- ●electric-plant-import — Account and the client record load panel, breaker, outlet, room. Harborline stays compiled.
- ●tier-licensing — LIC-CABLE / LIC-ELEC / LIC-BOTH on Billing, the invoice, and the price book. Not Stripe.
- ●alacarte-addons — extra field seat $35, extra building $30, camera map $25. No twenty checkboxes.
- ●lantern-launch-site — product + pricing on lantern.enlightenstudios.us. Powered by Enlighten stays the footer.
Tuesday, September 15, 2026
Need to do: show electrical drops on the floor drawing (panel → pin), not only the Drops list. Electric + Cable and Harborline full showcase. Electric-only shops keep floors off for now.
- ●New launch card: Electrical floor plan for drops. Honest seed is Need to do — this is not shipped.
- ●Not the same as hover-on-jack. Closet LDAP/TDR, wifi heatmap, and floors-from-plant stay ahead of it.
- ●Package cards already on the board: Electric-only rail, Electric + Cable Pro, demo seats per package, shop tickets. Launch website stays later on /for-contractors.
Electric Pro is a published package at $99/mo for the office seat and $35/mo per named field seat — the same meter as Cable Pro. Panels, drops, the panel Lens, electrical SKUs, and Harborline sample WO-0002 are live. Cable Pro shops do not see that rail.
- ●Published on /for-contractors/pricing next to Cable Pro. Admin client picker has the fifth card. Check or QuickBooks, Net 15 on seats, customer invoices Net 30. No Stripe.
- ●An Electric Pro shop gets Panels, Drops, and the panel Lens. Closets and the jack map stay off. Cable Pro and MSP shops do not grow an electrical rail.
- ●Breaker schedules stay two columns on a phone, used vs spare vs open, amp tally per leg — not an NEC load calculation.
- ●Find on Harborline also matches outlet numbers and panel codes. Work orders on Electric Pro hang device, homerun, breaker, and labor lines first.
- ●Harborline sample WO-0002 is a fictional range circuit on LP-1A. No real Waukesha building. Electrical import CSV is still open.
Fifth package, for electricians: $99/mo for the office seat and $35/mo per named field seat, the same meter as Cable Pro. Panels with a real breaker schedule, drops that know which panel and which breaker they are on, and a Lens that reads the panel instead of the rack.
- ●Panels draws the door card: odd left, even right, phase per position, multi-pole breakers spanning their spaces, used vs spare vs open.
- ●Amp tally per panel and per leg against the main. It is a sum of what a tech typed on each circuit — not an NEC load calculation.
- ●Drops carry the outlet number, room, mounting, device amps, and the breaker they come from. Search an outlet, a room, a panel, or a word from a circuit label.
- ●Electrical Lens is its own tool at /lens/electric. The cabling Lens is unchanged.
- ●Electrical SKUs — device, homerun, breaker, gear, labor, trip, permit — sit in the shared price book, so work orders and Net 30 invoices already bill them.
- ●Off for every existing company. Cable Pro and MSP shops see no electrical rail. Harborline has a fictional demo plant; there is no real building, no utility read, and no meter scrape.