RackLume

Waukesha, Wisconsin · what’s new

What’s new.

Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

Showing 2 of 411

Clear filters

Friday, September 18, 2026

  1. this deploy

    In-wall access points file as APs again

    A merge narrowed the controller model match, so in-wall access points and the 16-port PoE switch were being filed as plain clients on Air and Computers. The wider match is back and the test suite is green again.

    • ●Air lists every access point the last pull returned; the PoE switch stays a switch.
    • ●Nothing changed in the pull itself — only how a model name is read. Password hashes untouched.
  2. this deploy

    In-wall access points file as APs again

    A merge narrowed the controller model match, so in-wall access points and the 16-port PoE switch were being filed as plain clients on Air and Computers. The wider match is back and the test suite is green again.

    • ●Air lists every access point the last pull returned; the PoE switch stays a switch.
    • ●Nothing changed in the pull itself — only how a model name is read. Password hashes untouched.

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.