
Waukesha, Wisconsin · what’s new
Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.
Wednesday, September 23, 2026
this ship
Unmanaged NICGIGA boxes can sit on the floor plan. Place device now includes Switch (teal chassis). IP phones already used Place Phone (purple circle); that mark is in the pin legend too. Lantern still cannot scrape unmanaged ports.
Sunday, September 20, 2026
this ship
UniFi access points were landing under Switches because the controller JSON includes a virtual 8-port table on in-wall APs. Those are passthrough NICs. The two unmanaged NICGIGA 4×2.5G + 2 SFP boxes can be added as 6-port faceplates. Lantern cannot read their per-port state.
Friday, September 18, 2026
this deploy
Switches and Air were reading two different copies of the same box — Air had the real 16-port PoE switch while the closet still showed the 24 ports someone typed before the controller was connected. There is one switch now, and it is the one the controller reports.
this deploy
Open Switches and every chassis on the plant draws the same faceplate Air does — 16 copper plus its 2 SFP cages on a 16-port switch, with the PoE chip in the header. Tap a plate to open that switch.
this deploy
Open a closet and the switch draws the same faceplate Air uses — PoE copper, plain copper, and SFP uplinks. Under the rack there is a new Ports in this cabinet list so you can trace a live drop that has no PoE on it.
Waukesha
Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.