RackLume

Waukesha, Wisconsin · what’s new

What’s new.

Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

Showing 3 of 411

Clear filters

Thursday, September 24, 2026

  1. this ship

    Floors stacks Add floor, then chips, then the plan

    On Floors, Add floor is above the floor chips, and the 2D plan is under that — same stack on a phone and on a desktop. The drawing is full width. The leftover left column is gone.

    • ●Hard-refresh Floors. Phone and desktop share the order. Browse / Place stay under the plate. Password hashes untouched.

Wednesday, September 23, 2026

  1. this ship

    Phone Floors puts the 2D plan under Add floor

    On a phone, Floors stacks Plus floor, then the floor chips, then the 2D plan and device pins. Switch Garage / First Floor / Second Floor and the drawing sit together. Desktop still keeps chips and Add floor on the left.

    • ●Walk install and the Floor drawing PDF card sit under the plan on a phone. Desktop two-column layout did not move.
    • ●Switches: Add a switch sits under the faceplate on a phone. Desktop still puts the form above. Password hashes untouched.

Thursday, September 17, 2026

  1. this deploy

    Location dropdown fits the phone top bar

    The building picker next to LANTERN is still a real dropdown. On a phone it shows MapPin and one truncated word (Cobus, Harborline) so the bar fits 320 through 430. Open the list for the full name. Find stays the search icon. Contact stays nowrap.

    • ●Phone header uses the LANTERN icon so the lockup PNG is not squeezed. Desktop still shows icon + LANTERN.
    • ●Did not restyle OG cards, Computers/Phones lists, or the Enlighten footer.

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.