RackLume

Waukesha, Wisconsin · what’s new

What’s new.

Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

Showing 3 of 411

Clear filters

Friday, September 18, 2026

  1. this deploy

    Harborline demo does not show another shop’s APs

    UniFi last pull stays on the company that owns Integrations and the PC agent token. Harborline demo seats keep the Tacoma sample plant — not Cobus UniFi APs, switch faceplates, or controller cards.

    • ●Air / Switches / File all read that company’s snapshot only. A demo tenant cannot inherit the operator last pull.
    • ●Enlighten / Cobus still sees the house UniFi pull. Password hashes untouched.

Thursday, September 17, 2026

  1. this deploy

    Harborline testers, Computers agent, Study B under Find

    Harborline walk is the testable product. Plant → Computers now takes HTTPS-out inventory. Signed-in Find keeps search and shows Study B plant cards. First building and a live switch pull stay blocked.

    • ●ten-day-beta — Harborline testers can run Find, Floors pins, Air, Billing PDF, Lens, CSV, demo seats. First building stays its own card.
    • ●computers-tab — Company admin zip POSTs hostname, user, last seen. Harborline demo rows stay. SMART is pc-health. No inbound scan.
    • ●home-hardware-overview — Study B cards on signed-in /. Find stays on the rail. Not a NOC.
    • ●floors-org-plant stays Doing — real-street plate is first-building. Did not invent a Waukesha address.
    • ●plant-data-source stays Doing — collector overlay + typed fallback are live; a real switch/LDAP pull needs Michael's LAN.

Wednesday, September 16, 2026

  1. this deploy

    Printed Harborline tester walk

    Signed-in testers print /walk: Find a drop, Floors pins, Air heat, Billing PDF, Lens snaps, then the walk CSV — plus a jack checklist grouped by floor. Harborline is the demo plant, not a customer.

    • ●Print this walk. 214-A / HL-2W-1414 / IDF-2W is the Harborline stop. Orange jacks, cyan cameras, amber electrical on Floors.
    • ●Jack table is basement / floor 1 / floor 2 from the plant file. Did not invent a Waukesha address. Next card is Find filtered to one floor.

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.