RackLume

Waukesha, Wisconsin · what’s new

What’s new.

Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

Showing 2 of 411

Clear filters

Friday, September 18, 2026

  1. this deploy

    Air reads live network first, floor plan last

    On Air, the AP list, LAN scan, walk samples, switch faceplate, and the access point list come first. The floor plan drawing and its PDF upload now sit full width at the bottom of the page.

    • ●Upload, Open PDF, pins, and hover cards work the same — only the order moved. Password hashes untouched.
  2. this deploy

    Air puts the AP list on the left

    On Air, APs · last pull sits in the left column with the LAN scan count under it. Walk samples and the switch last-pull faceplate stay on the right.

    • ●Locations is no longer a tiny island far left of the AP list. Password hashes untouched.

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.