RackLume

Waukesha, Wisconsin · what’s new

What’s new.

Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

Showing 2 of 411

Clear filters

Wednesday, September 16, 2026

  1. this deploy

    Air and Stats lead with the walk, not Tacoma fiction

    Find, Air, and Stats now count typed walk samples as the wifi numbers. Harborline switch PoE, VLAN mix, and associated clients stay labeled sample. The heatmap blooms already shipped.

    • ●Stats opens on walk quality / band / SSID. Sample PoE and top talkers no longer look live.
    • ●Find’s wifi KPI is walk samples. Harborline-Corp client counts stay in the hint, labeled sample.
    • ●Did not touch launch card bars, the price sheet, or first-building. Native iPhone RSSI is still not this phase.

Tuesday, September 15, 2026

  1. this deploy

    Air shows actual walk-sample usage

    Air and Stats now count the typed walk — quality, band, SSID, and which AP the samples sit on. Harborline still labels the demo airtime. A real building never shows Tacoma clients.

    • ●Each walk point rolls into strong / ok / weak and 2.4 / 5 / 6. Nearest AP on that floor gets the count.
    • ●Stats lists the same walk numbers next to the labeled Harborline sample pulse.
    • ●Controller airtime is still not this phase. Heatmap blooms stay on the wifi-heatmap card.

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.