RackLume

Waukesha, Wisconsin · what’s new

What’s new.

Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

Showing 17 of 411

Clear filters

Monday, September 21, 2026

  1. this ship

    Promo last slide is /signup

    The Facebook Coming Soon reel now ends on lantern.enlightenstudios.us/signup. Slide 9 dropped the Cable Pro-first waitlist tail. Andrew still reads each square. /coming-soon stays Mike’s kit, not the tester page.

    • ●Last square footer is /signup. Confirm email, Android APK, iPhone Home Screen.
    • ●facebook-promo-signup-cut is checked off. Silent 4:5 and 9:16 recut with the stills. Password hashes untouched.
  2. this ship

    Free-first Facebook reel is on /promote

    The sample reel now leads with Free edition live — sign up at /start — then the paid shop tools. Andrew sounds more human. Slides use Outfit, not giant orange poster type.

    • ●Public /promote plays the voiced MP4. Same FacebookReel on /coming-soon and /admin/promote.
    • ●Storyboard: Free test launch, signup, Find, Floors (PDF + Path), Air/Switches (no UniFi on Free), Computers (5 max), Lens, Ask to upgrade, then Cable Pro $99+$35 and Electric Pro.
    • ●edge-tts AndrewNeural +8% rate, +4Hz pitch, +12% volume. Did not restamp UniFi 8-port or heatmap. Frozen lockup and rail.
  3. this ship

    Wiring paths on Floors + public /start

    Saved cable paths now draw as cyan lines on the everyday Floors map, not only in the PDF studio. Company admins and techs click vertices on the map, name the run, and save. Free seats stay on their empty plant. /start is the packages + signup page — not the launch deadline board.

    • ●Click-click Path on Floors (Enter or double-click to finish). PDF Path stays. Snap to jack/closet. Same 0–1 coords.
    • ●Signup stays public at /signup and on /start. Free never sees Harborline, Cobus, Enlighten, or operator UniFi. Others ARP stays hidden. Jobs/Billing stay gated with Ask to upgrade.
    • ●free-start-page and floor-wire-path (map overlay) are checked off. Did not restamp UniFi 8-port or heatmap. No Stripe. No DNS change.

Sunday, September 20, 2026

  1. this ship

    Coming Soon reel — Andrew sells the walk

    The Facebook sample now has energy. Andrew reads each square — closet map, Find, Lens, Floors, Jobs — not a two-word teaser. Slide 1 does not stack Coming Soon and Free edition. Waitlist is slide 9.

    • ●facebook-promo-voice stays done. Primary download is the MP4 with voice.
    • ●Rate +15% and a little pitch lift. Still Andrew, not a radio ad.
    • ●Frozen OG, lockup, and rail untouched. Did not restamp UniFi or heatmap.
  2. this ship

    Coming Soon slide 1 names the free edition

    The first Facebook still and the first spoken line now say Coming Soon and that a free edition is coming soon. Headline stays The closet map is almost here. Silent and voiced reels rebuilt from that square.

    • ●facebook-promo-reel and facebook-promo-voice stay done. Two chips on slide 1 — not a wrapping slogan.
    • ●VO line 1: Coming soon. A free edition is coming soon. AndrewNeural, Aria fallback. Mix timing unchanged.
    • ●Frozen OG, lockup, and rail untouched. Did not restamp UniFi or heatmap.
  3. this ship

    Coming Soon reel — easy spoken read

    The Facebook Coming Soon sample now has an unhurried voice on each slide: edge-tts en-US-AndrewNeural, not an announcer. Unmute on /coming-soon or /admin/promote. Silent cut kept.

    • ●facebook-promo-voice stays done. Primary download is the MP4 with voice.
    • ●Ten one-line reads timed to the ~4s cards. Fallback is Aria if Andrew is missing.
    • ●Frozen OG, lockup, and rail untouched. Did not restamp UniFi or heatmap.
  4. this ship

    Coming Soon Facebook reel with voice

    The ten Coming Soon squares now play as a 1080 sample with a spoken line on each slide. Unmute on /coming-soon or /admin/promote. Silent cut kept. Facebook autoplay stays muted.

    • ●facebook-promo-voice is checked off. Primary download is the MP4 with voice.
    • ●Voice is a clear American male read (edge-tts Andrew). Stills were not redrawn.
    • ●Frozen OG, lockup, and rail untouched. Did not restamp UniFi or heatmap.
  5. this ship

    Coming Soon Facebook reel — one clip

    The ten Coming Soon squares are one silent Facebook video: 1080 square for Feed, plus 4:5 and 9:16 letterboxed copies. Download and play it at the top of /admin/promote and /coming-soon. The stills and captions stay.

    • ●facebook-promo-reel is checked off. facebook-coming-soon stays done — the ten PNGs were not redesigned.
    • ●H.264 MP4, yuv420p, faststart, ~40s, no stock music. Frozen OG, lockup, and rail untouched.
  6. this ship

    Coming soon promo kit — 10 Facebook posts

    Ten purple/orange Facebook squares, a public /coming-soon page, and Enlighten /admin/promote next to Brand. Waitlist mails Mike. The phone app today is Add to Home Screen. Native stores stay Need to do. Free small-shop map is a waitlist, not a SKU.

    • ●facebook-coming-soon, admin-promo-page, coming-soon-page, and pwa-home-screen are checked off.
    • ●store-app-wrappers stays Need to do. free-residential-tier is Doing as waitlist only — paid Cable Pro still comes first.
    • ●Frozen OG, lockup, and rail untouched. Powered by Enlighten stays on the posts.

Wednesday, September 16, 2026

  1. this deploy

    Board: year-end income + Lens wall proof + new-build walk

    Need-to-do cards for paid cash by end of 2026 plus Michael’s Lens wall-faceplate proof and a new-build walk after the first check. lantern-launch-tick only refreshes percents on existing cards — it does not invent new lines.

    • ●lens-faceplate-proof — HIGH PRIORITY. Wall faceplate / jack proof in Lens (not MDF/IDF rack). Michael’s original idea.
    • ●neighbor-msp-cable / print-leavebehind / first-building — Tritech + Brew City PC outreach and leave-behind. Year-end income path.
    • ●new-build-walk — AFTER FIRST CHECK. Cabler Lens-mark → floor plan → IT adds hardware/APs. free-residential-tier + residential-floors stay later.
    • ●floor-wire-path stays Need to do — pathway overlay tool NOT shipped. Tick timer does not add cards; deploy boots the stamp.
  2. this deploy

    Board: year-end income path + neighbor calls

    Need-to-do cards for first paid cash by end of 2026: real building, Tritech + Brew City PC outreach, printed leave-behind. L3 HTTPS-OUT stays the MSP wedge. Free residential / house floors wait until after the first check.

    • ●neighbor-msp-cable — Tritech (Waukesha) + Brew City PC (Oconomowoc) with Kelley / RD / Edge / Kohl / Terminal-Andrae. Neighbors, not customers yet.
    • ●print-leavebehind — lockup + Powered by Enlighten for those meetings.
    • ●first-building / plant-csv / invoice-pdf / L3 / home-hardware-overview notes refreshed for year-end income. plant-data-source and first-building stay not done.
    • ●free-residential-tier + residential-floors — after first check / commercial first building. Do not build now. No Stripe. Harborline is not a customer.

Tuesday, September 15, 2026

  1. this deploy

    Price sheet print fills the page

    Print this sheet no longer leaves Packages stranded over a blank gap, and the white paper frame around the dark sheet is gone. Rates, packages, and import each get their own page.

    • ●Packages starts on page 2 with the four cards. Plant import and how you pay are page 3.
    • ●Print margin is ink to the paper edge. Card drop shadows are off so the sheet is not a box inside a box.
  2. this deploy

    Price sheet prints on three pages

    Print this sheet on contractor pricing no longer adds a blank first or last page. The signed-in header and footer stay off the PDF. The sheet itself is the document.

    • ●App rail, sticky header, and Powered by footer are hidden when you print a contractor sheet.
    • ●Viewport-tall shells are collapsed so Chrome does not invent empty letter pages around the copy.

Wednesday, September 16, 2026

  1. this deploy

    Printed leave-behind for neighbor meetings

    One sheet at /for-contractors/leavebehind for Tritech, Brew City PC, and the Kelley line. Lockup and Powered by Enlighten print. Not a new homepage.

    • ●print-leavebehind — Year-end income #3. Print this sheet. No Stripe.
    • ●Neighbors, not customers yet. Did not invent a first-building address.

Tuesday, September 15, 2026

  1. this deploy

    Finish-speed dates on Launch, admin, and the contractor timeline

    Chrome is Tuesday, September 15, 2026. Charge-the-walk stays Friday, October 30, 2026. Remaining work is a sequence before that Friday — plant CSV, price book, invoice PDF, first real building — not a fake weekly calendar. No Stripe.

    • ●Public /launch, Enlighten /admin/launch, and /for-contractors/roadmap share one finish-speed sequence.
    • ●Only two calendar dates: chrome now, charge day. Plant import is next. Stripe stays later.
    • ●Did not invent Oct 3 / 10 / 17 / 24. Sequence plus those two dates is the honest finish-speed.
  2. this deploy

    Contractor timeline builds again

    Production deploy was blocked on a TypeScript error on /for-contractors/roadmap. Optional due dates still print when present. Did not start plant CSV.

    • ●formatLaunchDeadline only receives a string due, not an empty object from 'due' in item on const PHASES.
    • ●Chrome Tuesday 15 Sep 2026 and charge Friday 30 Oct 2026 stay the only calendar dates. Live hashes stay in /root/Lantern/data.
  3. 04:08 UTC

    Go-to-market packet and Cable Pro price

    Public contractor landing, print one-pager, price sheet, plant-import scope, business plan, timeline, and sales playbook. Those routes are not behind login.

    • ●cb385de 04:08 UTC · Live — Publish Lantern go-to-market pages and Cable Pro pricing.
    • ●/for-contractors, /pitch, /for-contractors/plan, /roadmap, /playbook, /pricing, /import.
    • ●Published price: $99 office, $35 field, extra building $30, import $1,500–$8,000 typical $3,500. No Stripe.

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.