
Waukesha, Wisconsin · what’s new
Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.
Saturday, September 19, 2026
this deploy
The Harborline admin login card is shop admin (Team, billing, invites), not a field tech. A Team role save had left that seat as tech. The roster now pins every Harborline login-card seat back on boot. Passwords were not rewritten.
Friday, September 18, 2026
this deploy
Three demo seats existed but their passwords were published nowhere, so trying them with the LanternDemo1 the login page prints said Wrong password. The login cards now list all nine seats, each with its own password.
Tuesday, September 15, 2026
this deploy
admin@harborline.local was a demo-seat shortcut at the bottom of login, not a signed-in account. Those seats now sit under Harborline demo so the form stays empty.
01:53 UTC
The form does not prefill Harborline. Tap a demo card to fill that seat. Forgot / reset mails a two-hour link. Admin is a different seat than the demo.
00:47–01:22 UTC
First stretch of the day. Lens stops covering the rack. Harborline becomes a signed-in demo tenant. Mike gets a real operator console. Clients lead with buildings so a phone can still reach Admin.
Waukesha
Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.