
Waukesha, Wisconsin · what’s new
Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.
Wednesday, September 16, 2026
this deploy
Same filterable table on Phones, Cameras, and Air. Floor dropdown with counts, green/red up-down, IP and MAC you can copy, VLAN, jack, and switch port. Search name, IP, or MAC. Heatmap on Air stays the walk.
this deploy
Harborline Phone and Camera circuit pages keep the switch and patch-panel chassis on screen. PortGrid is six ports wide at 320 / 375 / 390 / 430. Source detail wraps. No live DC bind.
this deploy
Same filterable table Mike approved on Computers: 10px filters, panel cards on a phone, dense table on a laptop. Green/red up-down, IP and MAC you can copy, VLAN, jack, and switch. Heatmap on Air stays the walk.
Tuesday, September 15, 2026
01:33 UTC
The closet hole: desk phone on the wall jack (PoE, VLAN 20), workstation daisy-chained through the phone. Search an extension. File a phone from Lens. Open /phones for every Harborline location.
Waukesha
Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.