
Waukesha, Wisconsin · what’s new
Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.
Friday, September 18, 2026
this deploy
A merge narrowed the controller model match, so in-wall access points and the 16-port PoE switch were being filed as plain clients on Air and Computers. The wider match is back and the test suite is green again.
this deploy
A merge narrowed the controller model match, so in-wall access points and the 16-port PoE switch were being filed as plain clients on Air and Computers. The wider match is back and the test suite is green again.
Waukesha
Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.