RackLume

Waukesha, Wisconsin · what’s new

What’s new.

Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

Showing 2 of 411

Clear filters

Thursday, September 17, 2026

  1. this deploy

    Lens shows the wall plate, not just the cable ID

    On Lens, look up a jack or cable ID. Harborline 214-A / HL-2W-1414 lists the wall faceplate, ports on that plate, and what is plugged in from the plant. Not the MDF/IDF rack. Not a live scrape.

    • ●Lookup accepts HL-2W-1414 or 214-A. Plate ports and plugged-in hostnames come from the plant record.
    • ●Honest first slice. Phone still points at the plate. Did not invent a Waukesha address.

Wednesday, September 16, 2026

  1. this deploy

    Wire pathways added to the board

    Need to do on the launch board: cabling techs mark cable paths over the existing Floors PDF. The drawing upload is already live — this card is the pathway overlay, not a second floor product. Not shipped.

    • ●floor-wire-path — overlay cable runs on the Floors PDF already in the shop. Not closet port→circuit. Not L3. Not first-building.

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.