RackLume

Waukesha, Wisconsin · what’s new

What’s new.

Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

Showing 5 of 411

Clear filters

Friday, September 18, 2026

  1. this deploy

    The port lists follow the same amber rule as the plate

    The last orange accents around switch ports went neutral. Picking a port row on a switch highlights it in white now, and in a closet the PoE pill only lights up on a port that is actually pushing watts.

    • ●The selected port row on a switch is a neutral highlight instead of an orange one.
    • ●Closet port list: the PoE pill is amber only when that port is drawing watts, and the Active / PoE / All buttons no longer use the orange accent.
  2. this deploy

    The MDF cabinet shows every active port, not just PoE

    Open a closet and the switch draws the same faceplate Air uses — PoE copper, plain copper, and SFP uplinks. Under the rack there is a new Ports in this cabinet list so you can trace a live drop that has no PoE on it.

    • ●Filter the list by Active, PoE, or All. Each row opens the circuit path.
    • ●A row carries jack and room, VLAN, MAC, TDR length, and the directory name when the plant has them.
    • ●Watts and link speed show only when a controller pull reported them. Everything else reads Unknown instead of a guess, and 0 W means the controller really said zero.
    • ●TDR length stays typed or tester. Lantern still does not bind your directory or scrape your switches.

Tuesday, September 15, 2026

  1. this deploy

    Closet, Air, and heatmap are on the launch board

    MDF/IDF faceplates and port-to-circuit are checked. Remaining closet work is on /launch: company plant on Find/Lens, floors geometry, walk-sample heatmap, honest Air/Stats, server snaps. No live LDAP or switch scrape this phase.

    • ●Find home, Lens overlay, Phones, Air, and Stats read the company plant. Harborline keeps the Tacoma sample story.
    • ●Walk samples are the heatmap on a real building. Port legend no longer claims a live LDAP bind.
    • ●Still open: server Lens snaps, floors plate for an imported building, a real Waukesha plant file from Mike.

Wednesday, September 16, 2026

  1. this deploy

    Closet Lens snaps stay on the server

    A Lens snap now lands on the company plant. The next tech on another phone sees it on the closet. Photos used to sit only on that device.

    • ●Open Lens, snap Rack A, then open that closet on another phone — the photo is there.
    • ●The JPEG lives with Fluke PDFs under data/uploads. lantern.json keeps the closet card, not the pixels.
    • ●Harborline demo seats share snaps. Electric panel snaps use the same store.

Tuesday, September 15, 2026

  1. this deploy

    Floor hover, closet LDAP/TDR, and cameras

    Floors now show a hover card with jack, switch port, LDAP, and TDR length. Closet ports carry the same facts. Cameras have a section and cyan pins on the plan. Charge day is Friday, September 25.

    • ●Hover a room, jack, closet, camera, or AP on Floors or Air. Tap still opens the circuit.
    • ●Patched closet ports list LDAP and feet on hover. Plant record — not a live DC bind or switch scrape.
    • ●Cameras is on the IT rail. Harborline dock and warehouse samples show IP, MAC, VLAN, and the switch port.

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.