
Waukesha, Wisconsin · what’s new
Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.
Thursday, September 17, 2026
this deploy
On Lens, look up a jack or cable ID. Harborline 214-A / HL-2W-1414 lists the wall faceplate, ports on that plate, and what is plugged in from the plant. Not the MDF/IDF rack. Not a live scrape.
Wednesday, September 16, 2026
this deploy
Need to do on the launch board: cabling techs mark cable paths over the existing Floors PDF. The drawing upload is already live — this card is the pathway overlay, not a second floor product. Not shipped.
Waukesha
Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.