RackLume

Waukesha, Wisconsin · what’s new

What’s new.

Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

Showing 3 of 411

Clear filters

Tuesday, September 15, 2026

  1. 03:19 UTC

    Customer invoices, Net 30, two-layer feature flags

    Billing is the shop’s ledger: work-order PO, catalog lines, Net 30. Enlighten can turn a module off for company admins; company admins can hide the same tools from field seats.

    • ●0ba37cf 03:19 UTC · Live — Add customer invoices and two-layer feature flags.
    • ●/billing is the contractor AR ledger (not Enlighten’s cut).
    • ●Flags are company-level and seat-level. Invoice rows survive deploys with the rest of the tenant file.
  2. 02:18–02:26 UTC

    MSP, Cable Pro, Advanced — then seat limits before upsells

    Package sits on the company (and optionally a seat) and maps onto module flags. Enlighten picks the mode on the client record. Harborline stays Advanced for sales walks.

    • ●MSP Basic is plant/Find without billing the customer from Lantern. Cable Pro is the offer (jobs, Fluke PDF, invoices). Advanced is both.
    • ●An employee who opens Jobs, Tests, or Lens sees intranet + Find copy, not a Cable Pro upsell, when that module is off for the seat.
  3. 02:03–02:06 UTC

    Jobs, PO, SKUs, Fluke PDF, SOP guides, feature flags

    Company admin is /team, separate from Enlighten /admin. Work orders carry a PO. Fluke is a PDF on the job — no LinkWare parse. SOP lives under Docs. Field and operator how-to books are /guide and /admin/guide.

    • ●8893a8a 02:03 UTC · Live — Ship company roles, SOP, jobs, Fluke tests, and feature flags.
    • ●Signup and first client contact are company admin. Harborline extra seats, SOP, a sample work order, and a LinkWare-style PDF seed when missing.
    • ●Lens captures length and product. /guide for the shop; /admin/guide for Mike.

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.