RackLume

Waukesha, Wisconsin · what’s new

What’s new.

Read about product updates and completed work. The Launch board tracks milestones, including the original mapping-service target of Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

Showing 1 of 467

Clear filters

Friday, November 13, 2026

  1. this release

    Document and trace closet connections

    MDF/IDF closets now have a connection workspace using RackLume's existing rack and switch graphics. Company editors can save physical patch cords, and permitted viewers can follow the documented path to its cable, jack, and devices.

    • ●Rack and Connections views support tap and keyboard selection, optional patch-cord labels, and browser print/PDF traces.
    • ●Controller link, VLAN and PoE readings remain separate from documented physical wiring. Missing or ambiguous path details stay explicit.
    • ●Revision conflicts protect concurrent work. Disconnect removes only the saved patch cord, and imports/controller updates preserve authored records, including unresolved references.
    • ●Customer and operator guides and the relevant setup instructions describe the final workflow.

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.