RackLume

Waukesha, Wisconsin · what’s new

What’s new.

Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

Showing 5 of 411

Clear filters

Saturday, September 19, 2026

  1. this deploy

    Home Air counts this shop's last controller pull

    Signed-in / now uses the same AP list as Air: last UniFi pull for that company, plus APs already on the plant. A friend shop with an empty plant file still sees their APs after Test pull. Harborline stays the compiled demo and never inherits another company's snapshot.

    • ●Home, Air, and home studies share one helper. No per-shop recode after a tester pulls UniFi.
    • ●Empty until that shop pulls UniFi or adds an AP. Switches and cameras stay the plant file.
    • ●Password hashes untouched.

Thursday, September 17, 2026

  1. this deploy

    Harborline testers, Computers agent, Study B under Find

    Harborline walk is the testable product. Plant → Computers now takes HTTPS-out inventory. Signed-in Find keeps search and shows Study B plant cards. First building and a live switch pull stay blocked.

    • ●ten-day-beta — Harborline testers can run Find, Floors pins, Air, Billing PDF, Lens, CSV, demo seats. First building stays its own card.
    • ●computers-tab — Company admin zip POSTs hostname, user, last seen. Harborline demo rows stay. SMART is pc-health. No inbound scan.
    • ●home-hardware-overview — Study B cards on signed-in /. Find stays on the rail. Not a NOC.
    • ●floors-org-plant stays Doing — real-street plate is first-building. Did not invent a Waukesha address.
    • ●plant-data-source stays Doing — collector overlay + typed fallback are live; a real switch/LDAP pull needs Michael's LAN.

Wednesday, September 16, 2026

  1. this deploy

    Home study B adds a shop row

    Study B is the pick: five plant cards, then a quieter Tickets / Billing / Jobs row when those modules are on. Production Find is unchanged. Field seats see assigned work, not past-due AR.

    • ●home-hardware-overview is Doing (67%). Mike picked plant cards. Flag-gated shop row on /home-studies?study=b and /admin/home-studies?study=b.
  2. this deploy

    Home study B splits Tech vs company admin

    Study B shows plant faults plus my tickets and jobs for techs, and the full five cards plus billing for company admin. Harborline has Tech / Admin previews. Operator /admin home is unchanged.

    • ●Tech: plant faults, my tickets, my jobs — no AR. Company admin: five cards, all tickets/jobs, billing if flags on. /home-studies?seat=tech|admin. /admin/home-studies is a company-admin mock.
  3. this deploy

    Board: home hardware studies + invoice from catalog

    Need-to-do cards for a signed-in home hardware overview and a Write invoice that picks price-book SKUs. Three live study pages so a look can be picked. Production Find is unchanged. Not warehouse inventory.

    • ●home-hardware-overview — studies at /admin/home-studies and Harborline /home-studies?study=a|b|c. Phones, Cameras, Air, Computers, Switches. Closets stay racks.
    • ●invoice-from-catalog — Write invoice from this company’s price book. Same SKUs as work orders. Not qty-on-hand, receiving, bins, or barcode stock. Cross price-book and invoice-pdf.
    • ●switches-tab stays the sibling Switches list card. first-building stays parked. No Stripe. No LDAP scrape. plant-data-source stays not done.

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.