
Waukesha, Wisconsin · what’s new
Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.
Sunday, September 20, 2026
this ship
A shop pastes Omada Cloud client id + secret. Test pull hits TP-Link Omada Northbound. Local SDN posts JSON HTTPS-out. Password hashes untouched.
this ship
A shop pastes a Mist org API token on Account or Operator → Integrations. Test pull hits api.mist.com for APs, switches, and ports. Junos REST stays on the shop collector. Password hashes untouched.
this ship
Instant On, Insight, Cisco Business, and MikroTik map shop HTTPS-out JSON onto the same ingest snapshot as UniFi. Instant On is never scraped from Plesk. Other L2 uses generic collector JSON.
this release
A shop pastes a Meraki dashboard API key on Account or Operator → Integrations. Test pull hits api.meraki.com for devices, PoE, and ports, then Set uses the same overlay as UniFi. Harborline stays the compiled demo. Password hashes untouched.
Saturday, September 19, 2026
this deploy
Test pull on Operator → Integrations now GETs each adopted device so switch ports, PoE state, and AP radios come from the official Network API device object. The list endpoint only returns capability tags. Classic Network 8.1.113 still uses the LAN PC Agent. Harborline stays compiled.
Friday, September 18, 2026
this deploy
Set all on Integrations now merge-adds the last UniFi pull onto Switches, Air, Cameras, and Computers using controller hostnames. WAN, Default, and public IPs stay off the plant. Unknown LAN-scan Others with the same MAC move out of Others.
this deploy
Operator → Integrations now opens on one compact UniFi row — Connected, controller, last pull clock — with an Edit button for the key and the local controller login. The pulled device list moved behind its own Devices and clients disclosure, so 30-plus rows no longer bury the settings.
this deploy
The UniFi devices list on Integrations now has Set all at the top. Each row is Set. Same plant write — just the control name.
Waukesha
Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.