RackLume

Waukesha, Wisconsin · what’s new

What’s new.

Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

Showing 5 of 411

Clear filters

Saturday, September 19, 2026

  1. this deploy

    Harborline demo admin is company admin again

    The Harborline admin login card is shop admin (Team, billing, invites), not a field tech. A Team role save had left that seat as tech. The roster now pins every Harborline login-card seat back on boot. Passwords were not rewritten.

    • ●admin@harborline.local is org_admin again. ops@ stays shop owner. Named techs stay techs.
    • ●Team cannot demote a login-card Harborline seat. Tools reset also restores role, not only the printed password.
    • ●None of those seats can open Enlighten Admin. Password hashes untouched.

Friday, September 18, 2026

  1. this deploy

    Every Harborline demo seat is on the login page with a password that works

    Three demo seats existed but their passwords were published nowhere, so trying them with the LanternDemo1 the login page prints said Wrong password. The login cards now list all nine seats, each with its own password.

    • ●ops@harborline.local, field@harborline.local, and desk@harborline.local are cards on the Harborline demo panel — Team, named tech, and employee walks.
    • ●One roster behind the cards, the seed, and the Tools reset, so a demo seat cannot exist without a card that prints a password that works.
    • ●Tools → Reset demo password now repairs all nine seats instead of two.
    • ●No stored password was reset and the Enlighten operator seat was not touched.

Tuesday, September 15, 2026

  1. this deploy

    Demo seats per package, plus Electric + Cable

    Harborline admin still shows the whole system. Sign in has a card per package: MSP, Cable Pro, Electric Pro, and Electric + Cable. Electric-only rail is panels, drops, jobs, billing, and tickets — no floors.

    • ●Sixth package: Electric + Cable Pro at the same $99 / $35 meter. Floors, closets, and APs come back on that seat.
    • ●Tickets is on the shop rail for Electric and the combo. Harborline sample tickets.
    • ●A Lantern launch website is on the board for later. It will live on lantern.enlightenstudios.us, not a fork of the Enlighten Studios homepage.

Wednesday, September 16, 2026

  1. this deploy

    Harborline demo seats match the package rail

    Sign in cards for admin, MSP, Cable Pro, Electric Pro, and Electric + Cable are live. Electric-only is panels and the bill — no floors. Tickets is on that rail.

    • ●admin@harborline.local / LanternAdmin1 sees the full system.
    • ●electric@ has Panels, Drops, Jobs, Billing, Tickets — no Floors or APs. both@ adds floors, closets, and cable.
    • ●Electric + Cable Pro is $149 / $50 on the contractor price sheet — more than Electric Pro. A separate launch website is still later.

Tuesday, September 15, 2026

  1. 02:38–02:43 UTC

    Harborline company-admin vs field demo; Mail tab

    Two Harborline cards: company admin cannot open Enlighten Admin; user demo is field-only. Production mail submits to the box postfix. Mail tab shows host, port, and from.

    • ●Company-admin demo cannot open Enlighten Admin. User demo is field-only.
    • ●Production mail goes to local postfix on 127.0.0.1:25.
    • ●Admin Mail tab shows the postfix target when SMTP_HOST is set, plus the existing test-send button.
    • ●Demo cards invite a mapped-plant walk instead of leading with what the seat cannot do.

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.