Waukesha, Wisconsin · what’s new
Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.
74 ships · latest Floor plan sits above wall scale
21 ships · latest Air floor chips sit on the plan; Install sits under it
22 ships · latest Guide is a step-by-step book for each package
128 ships · latest Lens shows the floor plan behind the labels
17 ships · latest Invoice PDF uses Outfit and an optional shop logo
4 ships · latest Panel-walk CSV loads a live building electrical plant
Friday, September 18, 2026
this deploy
Account Load writes panels, breakers, and outlets from a shop CSV. Excel TSV works. Panels and Drops read that file. Harborline stays the compiled demo. Password hashes untouched.
Wednesday, September 16, 2026
this deploy
A shop can load a panel walk the same way they load a cabling CSV. Billing shows the package license and three a la carte SKUs. /for-contractors/product is the launch product page.
Tuesday, September 15, 2026
this deploy
Electric Pro is a published package at $99/mo for the office seat and $35/mo per named field seat — the same meter as Cable Pro. Panels, drops, the panel Lens, electrical SKUs, and Harborline sample WO-0002 are live. Cable Pro shops do not see that rail.
this deploy
Fifth package, for electricians: $99/mo for the office seat and $35/mo per named field seat, the same meter as Cable Pro. Panels with a real breaker schedule, drops that know which panel and which breaker they are on, and a Lens that reads the panel instead of the rack.
123 ships · latest Portal is live on portal.racklume.com
8 ships · latest Changelog opens by area; the full log stays
14 ships · latest Enlighten admin can compose shop user accounts
Every ship is in one area. Nothing is removed.
Full logWaukesha
Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.