RackLume

Waukesha, Wisconsin · what’s new

What’s new.

Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

Showing 2 of 411

Clear filters

Tuesday, September 15, 2026

  1. this deploy

    Plant CSV loads into Find

    Enlighten can load a walk CSV on a client building. That company’s Find, closets, rooms, and circuits read the file. Harborline stays the compiled demo.

    • ●Columns: closet, panel, port, jack, room. Optional switch, cable ID, length. Sample at /samples/plant-walk.csv.
    • ●Upload lives on the client building record. Did not mark plant-csv done. First real building still needs Mike’s address and spreadsheet.

Wednesday, September 16, 2026

  1. this deploy

    A shop can load its own plant CSV

    Company admin loads a walk CSV on Account. Closet, jack, and room are enough. Find, Floors, and Closets read that file. Harborline stays the compiled demo.

    • ●Columns: closet, jack, room. Panel and port optional. Shop sample at /samples/plant-shop.csv. Full walk still at /samples/plant-walk.csv.
    • ●Enlighten can still load from the client building record. Replace needs a checkbox so a live plant is not wiped by accident.
    • ●First real building still needs Mike’s street and spreadsheet. Did not invent a Waukesha address.

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.