
Waukesha, Wisconsin · what’s new
Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.
Thursday, September 17, 2026
this deploy
The onboard 1G is unplugged. Primary IP is the fastest Up adapter (10 Gbps → a house NIC), not multicast and not a leftover on the stock NIC. Re-download 2026.09.17.10.
this deploy
Computers host information posts every physical adapter. A down 10G card still shows as Down. Primary IP skips multicast 224.0.0.22. Re-download PC Agent 2026.09.17.9.
this deploy
Host IP ignores multicast 224.0.0.22. SSD life reads Wear from each PhysicalDisk. CPU temp also asks Windows thermal-zone counters. GPU still nvidia-smi when NVIDIA is installed. Intel iGPU stays Unknown. Re-download the EXE.
Waukesha
Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.