RackLume

Waukesha, Wisconsin · what’s new

What’s new.

Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

Showing 7 of 411

Clear filters

Thursday, September 24, 2026

  1. this ship

    Guide is a step-by-step book for each package

    Guide now follows the package on the login. A free seat reads the free edition. An MSP seat reads the MSP book. The Enlighten admin login is the only one that sees every package.

    • ●Each section is ordered steps: sign in, then the map, then the shop tools that package includes.
    • ●https://lantern.enlightenstudios.us/guide — Harborline pictures stay labeled Demo. Password hashes untouched.
  2. this ship

    Four homepage directions for a future launch site

    Michael can open four numbered homepage idea cards at /samples/launch-home. Same Enlighten + Lantern panel as Sign up. Each card goes to /signup. Domain still TBD — this is not the live homepage.

    • ●1 Field map 2 Free seat 3 Two doors 4 Walk the plant (heat on Air, UPS off free).
    • ●Shop /guide restamped: Air heatmap, UPS shop-only, sideload vs Play, Safari Home Screen. Password hashes untouched.

Tuesday, September 22, 2026

  1. this ship

    Guide and board track floor plates still in progress

    The shop guide walks the floor the way it should work: add a floor and the chip shows at the top, one clip per story, Make 2D follows that clip. Garage is the example that matched. First Floor and Second Floor plates are still being lined up with their clips. Free edition this week stays the goal.

    • ●/guide: add the floor, film that story, Make 2D from that clip, architect PDF still wins, the clip stays, then place a device on that floor.
    • ●Launch board keeps floor video in Doing until those plates match and Add floor updates without a reload. Free, Android, and iPhone Home Screen stay Doing until a tester opens the map from both icons.

Monday, September 21, 2026

  1. this ship

    Free signup type matches the rest of Lantern

    /start, /signup, and the guide packages strip use Outfit at in-app card scale. The orange Impact-like poster headings are gone.

    • ●Hero and Sign up titles are section-title (Outfit ExtraBold 1.75–2.15rem, tracking -0.02em). Not display-title 6xl/7xl.
    • ●Package cards match /for-contractors: 11px kicker, 1rem ExtraBold names, 14px body. Guide /guide renders the live strip; packages-free.png is regenerated from that HTML.
    • ●Lockup, footer, and password hashes untouched. No Stripe.
  2. this ship

    Free test launch — guide and a usable empty map

    Free testers can sign up, open Floors/Air/Switches/Computers/Lens/Find on their own empty building, draw a Path, and read a guide that does not treat Harborline as their house. Jobs and Billing stay Ask to upgrade. This is a test launch for improvements.

    • ●Path on the everyday Floors map plus PDF studio. Find hides Harborline sample chips on a real empty plant. Computers empty copy does not assume Cobus or the shop EXE.
    • ●/guide and /admin/guide split Free vs Cable Pro vs Electric Pro vs operator. New pictures: packages-free.png, floors-path.png. Harborline PNGs labeled Demo.
    • ●Public /start + /signup stay open. No Stripe. UniFi pull stays Cable Pro. Did not dump the brochure onto /launch.

Wednesday, September 16, 2026

  1. this deploy

    Collector overlay, Lens plant, walk heat, shop guide

    Collector hosts land without a jack walk and without the switch already on the plant. Lens reads this company’s closets. Air heat is the typed walk. /guide how-tos match that.

    • ●l3-endpoints — no-walk overlay plus a collector switch that was not on the CSV yet.
    • ●lens-org-plant — Harborline still walks. Empty plant tells you to load a CSV. Real street is first-building.
    • ●wifi-heatmap — typed RSSI blooms. Real-street samples are first-building. Native dBm is wifi-phone-rssi.
    • ●ops-guide-plant — collector / Lens / Air copy restamped. Rail and OG freeze, so Harborline PNGs stayed.
  2. this deploy

    Shop guide pictures are on the how-tos

    /guide Harborline PNGs are in the tree and on the plant how-tos. Did not restamp chrome. Did not restyle the rail or OG card.

    • ●Find, Floors, Lens, Closets, Phones, Cameras, Computers, Air, login, jobs, billing, account figures point at public/guide.
    • ●Restamp stays open until screenshots are actually refreshed.

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.