
Waukesha, Wisconsin · what’s new
Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.
Saturday, September 19, 2026
this deploy
The Harborline admin login card is shop admin (Team, billing, invites), not a field tech. A Team role save had left that seat as tech. The roster now pins every Harborline login-card seat back on boot. Passwords were not rewritten.
Friday, September 18, 2026
this deploy
Three demo seats existed but their passwords were published nowhere, so trying them with the LanternDemo1 the login page prints said Wrong password. The login cards now list all nine seats, each with its own password.
Tuesday, September 15, 2026
this deploy
Harborline admin still shows the whole system. Sign in has a card per package: MSP, Cable Pro, Electric Pro, and Electric + Cable. Electric-only rail is panels, drops, jobs, billing, and tickets — no floors.
Wednesday, September 16, 2026
this deploy
Sign in cards for admin, MSP, Cable Pro, Electric Pro, and Electric + Cable are live. Electric-only is panels and the bill — no floors. Tickets is on that rail.
Tuesday, September 15, 2026
02:38–02:43 UTC
Two Harborline cards: company admin cannot open Enlighten Admin; user demo is field-only. Production mail submits to the box postfix. Mail tab shows host, port, and from.
Waukesha
Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.