RackLume

Waukesha, Wisconsin · what’s new

What’s new.

Read about product updates and completed work. The Launch board tracks milestones, including the original mapping-service target of Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

467 in the log

Bookmark with ?tag= and ?q= on this URL.

Floors

75 updates · latest Delete and rename floors on Floors

Air

24 updates · latest Air and Switches update from connected systems

Free edition

28 updates · latest Clearer instructions and private customer support

Plant

142 updates · latest Document and trace closet connections

Jobs & billing

20 updates · latest Keep Outfit fonts available for PDF downloads

Electric

4 updates · latest Panel-walk CSV loads a live building electrical plant

Site

128 updates · latest RackLume branding completed

Ops

10 updates · latest Sign in with fingerprint / Face

Other

36 updates · latest Restore Outfit typography across the portal

Close

Friday, November 13, 2026

  1. this repair release

    Restore Outfit typography across the portal

    The portal applies its Outfit font through an explicit root binding to the generated font metadata, restoring the intended typography after a font-class mismatch.

    • ●The root Outfit binding applies throughout the portal, including the MDF/IDF connection workspace.
    • ●Release checks now verify the actual loaded font and before/after screenshots at phone, tablet, and desktop sizes.

Thursday, October 22, 2026

  1. this release

    Choose what to set up, and resume any time

    Account → Setup guides new and existing users through the sections included in their tier and permissions.

    • ●Choose your sections, follow page-by-page instructions, and use the portal’s existing setup forms.
    • ●Skip a step, save it for later, or skip the entire guide. Progress follows your account across devices.
    • ●Restarting the guide keeps existing buildings, equipment, credentials and security settings. Tier and role limits still apply.
    • ●Customer and operator guides include current instructions and fictional training screenshots.

Tuesday, October 20, 2026

  1. this release

    Remaining product labels now use RackLume

    Sample pages, download names and historical release updates now display the RackLume product name.

    • ●Historical updates use current product wording without changing the original stored records, dates or progress.
    • ●Existing integrations, account data and installed companion apps retain the identifiers needed for compatibility.

Wednesday, October 7, 2026

  1. this ship

    Harborline demo passwords say RackLume

    Login cards print RackLumeAdmin1 / RackLumeDemo1. Harborline demo seat hashes were restamped to match. Enlighten operator hash untouched.

    • ●admin@harborline.local → RackLumeAdmin1. Package demos → RackLumeDemo1.
    • ●Tools → Reset demo password still repairs all nine seats to the printed roster.

Friday, October 2, 2026

  1. this ship

    YouTube film — the app, not cartoon people

    One film. You see the floor, drop pins, point Lens at the wall, walk Air, then pick a seat. Jenny talks at a normal pace. Cartoon walkers are off Brand.

    • ●Lens is point at the wall. You do not type a sticker.
    • ●Not uploaded yet. Watched the finished cut first.

Thursday, October 1, 2026

  1. this ship

    YouTube film — lay out the floor, then Lens

    One main film. You lay out the floor, drop the pins, then walk the hall. Lens shows what's on the wall. You do not type a port. Jenny talks slower. Seats and prices at the end.

    • ●Not uploaded yet. Watched the finished cut first.
    • ●Shorter seat spots stay on Brand under the main film.
  2. this ship

    YouTube films — walking the hallway, not the drawing

    Techs walk a real hall. Lens walks up to a wall jack. Air is a hallway walk with the heatmap on the tablet. Jenny stays.

    • ●Not a 2D floor plan under their feet. Not uploaded yet.
    • ●Watched every finished mp4 before calling them ready.
  3. this ship

    YouTube films — walking on the account floor plans

    People walk the First, Second, and Garage drawings from the account. The heatmap is the live walk. Tablets show those plans, not a smashed desktop page. Jenny stays.

    • ●Welcome is still organization and ticketing. Not uploaded yet.
    • ●Watched every finished mp4 before calling them ready.
  4. this ship

    YouTube films — people walk on your floor plans

    The stills are gone. Techs walk across the drawings from the account. Tablets show those plans. Jenny stays. Watched before they were called ready.

    • ●Welcome line is organization and ticketing. Harborline plant pages stay for Find, Closets, Jobs, and Panels.
    • ●Not uploaded yet.
  5. this ship

    YouTube showcase commercial — the whole shop in one film

    One longer film walks Find, Air, Floors, Closets, Panels, and Jobs. Seat spots stay. Jenny stays. Watched before they were called ready.

    • ●Scenes fade to black. The portal plays once, then a slow hold — no looping twitch.
    • ●Harborline on the screens is the fictional demo. Not uploaded yet.
  6. this ship

    YouTube films recut after a watch — no morph, new player files

    The twitching cut is gone. Walks dissolve once and hold. Brand plays new filenames so the page cannot keep an old cached movie. Jenny stays.

    • ●Watched the finished files before calling them ready.
    • ●Harborline on the tablet is the fictional demo.
  7. this ship

    YouTube spots watched before they were called ready

    Every finished mp4 is inspected for leftover green tablets before Brand is told they are ready. Jenny stays. Air and Floors on the tablet are the real pages.

    • ●Air is /wireless. Floors is /map. The 404 miss page is not the app.
    • ●Harborline on the tablet is the fictional demo. Not on YouTube yet.
  8. this ship

    YouTube showcase — one longer film of the whole shop

    A longer commercial walks Find, Air, Closets, Panels, and Jobs in one sitting. The short seat films stay. Jenny stays. Watched before they were called ready.

    • ●Each walk holds one person, then the real portal moves. No pose morph.
    • ●Harborline on the screens is the fictional demo. Not uploaded yet.
  9. this ship

    YouTube films recut — welcome spot, purple shirts, app on the tablet

    The still-frame cuts are gone. New films open with a welcome, walk techs in purple RackLume shirts, and put the real app on the tablet they are holding. Speech is rewritten to sound like a person.

    • ●Lens and Air keep the tablet facing you so you can see Find and the heatmap.
    • ●Not on YouTube yet. Harborline on the tablet is the fictional demo.
  10. this ship

    YouTube films recut — walking people, real tablet, plain speech

    The old still-image films are gone. New cuts walk a tech up to the jack or the panel. The tablet in the corner is the real portal. The voice talks like a person about what you are looking at and what each seat does.

    • ●Watch on Brand and Promo. Not on YouTube yet.
    • ●Harborline on the tablet is the fictional demo.
  11. this ship

    YouTube informative films — portal plus the job

    Seven short informative films are on Brand and Promo: guide facts, 3D people doing the work, and real portal click-throughs. Longer sectioned training comes next. They are not on YouTube yet.

    • ●Intro plus Free, MSP, Cable Pro, Advanced, Electric Pro, and Electric + Cable.
    • ●No slow pan on a still. Harborline on the screens is the fictional demo. Upload after Michael looks.
  12. this ship

    Instagram profile and first grid

    Instagram gets the same A as Facebook, a lockup grid square, and highlight covers. Bio and website sit in the kit. No URL on the picture.

    • ●Download on Brand and Promo. Apply on the logged-in Instagram.
    • ●Same live wordmark. Powered by Enlighten on the grid. Do not regenerate the SMS card.
  13. this ship

    Report opens Plant, Clients, Billing, Tickets

    The shop Report rail now opens four reports. Plant stays the network checklist. Clients, billing, and tickets are printable lists. This is not the Enlighten error log.

    • ●Rail children are Plant, Clients, Billing, and Tickets — icon plus one word.
    • ●Plant stays /report. New pages: /report/clients, /report/billing, /report/tickets.
  14. this ship

    YouTube intro and tier films

    Seven short films are on Brand and Promo for review — intro plus Free, MSP, Cable Pro, Advanced, Electric Pro, and Electric + Cable. They are not on YouTube yet.

    • ●Watch and download on Brand and Promo. Voice is shop-plain. No URL on the picture.
    • ●Facebook video later. Upload after Michael looks.
  15. this ship

    YouTube channel cover

    The YouTube banner is 2560×1440 with the live RackLume lockup in the strip phones and desktop keep. Trades line and Powered by Enlighten. No URL on the picture.

    • ●Download on Brand and Promo.
    • ●Same live wordmark. Safe area 1546×423. Do not regenerate the SMS card.
  16. this ship

    Facebook welcome square

    The first Facebook post image is a low-opacity closet — patch cords into a switch stack — with the live RackLume lockup. The link stays in the caption, not on the picture.

    • ●Welcome 1080 square and caption on Brand and Promo.
    • ●Same live wordmark. Powered by Enlighten. No URL burned into the PNG.
  17. this ship

    Facebook profile and cover

    The Facebook page kit is the live RackLume A on navy (1080) and the wordmark cover (1640×924) with the trades line and Powered by Enlighten. Download on Brand and Promo. Neighbor calls are Michael’s — off the Need-to-do list.

    • ●Profile and cover at /brand/facebook. Same files on Promo.
    • ●Call Tritech / Brew City is off the board. Network report stays live on Report.

Tuesday, September 22, 2026

  1. this ship

    Enlighten admin can compose shop user accounts

    Operator → Users on /admin/users creates a shop seat with package, username, email, first and last name. Filter the list, then edit or disable. Password hashes never appear. Team invites stay for company admins.

    • ●Enlighten role admin only. Harborline demo seats stay compiled.
    • ●Temporary password is emailed. Hash stays in the store. Password hashes untouched on deploy.
  2. this ship

    Work tab: MSP client book and encrypted vault

    MSP shops get Work → Book: client info, attach shop locations, PCs from PC Agent / LAN scan, and an encrypted password vault. Hardware add stays on Systems. Secrets are AES-GCM — not plaintext in lantern.json and not in the audit log.

    • ●Rail label is Book. Cable Pro and Electric Pro stay on Jobs / Billing.
    • ●Show reveals a password once on screen. Label only in the log. Password hashes untouched.

Saturday, September 19, 2026

  1. this deploy

    Harborline demo admin is company admin again

    The Harborline admin login card is shop admin (Team, billing, invites), not a field tech. A Team role save had left that seat as tech. The roster now pins every Harborline login-card seat back on boot. Passwords were not rewritten.

    • ●admin@harborline.local is org_admin again. ops@ stays shop owner. Named techs stay techs.
    • ●Team cannot demote a login-card Harborline seat. Tools reset also restores role, not only the printed password.
    • ●None of those seats can open Enlighten Admin. Password hashes untouched.

Friday, September 18, 2026

  1. this deploy

    Every Harborline demo seat is on the login page with a password that works

    Three demo seats existed but their passwords were published nowhere, so trying them with the LanternDemo1 the login page prints said Wrong password. The login cards now list all nine seats, each with its own password.

    • ●ops@harborline.local, field@harborline.local, and desk@harborline.local are cards on the Harborline demo panel — Team, named tech, and employee walks.
    • ●One roster behind the cards, the seed, and the Tools reset, so a demo seat cannot exist without a card that prints a password that works.
    • ●Tools → Reset demo password now repairs all nine seats instead of two.
    • ●No stored password was reset and the Enlighten operator seat was not touched.
  2. this deploy

    The MDF cabinet shows every active port, not just PoE

    Open a closet and the switch draws the same faceplate Air uses — PoE copper, plain copper, and SFP uplinks. Under the rack there is a new Ports in this cabinet list so you can trace a live drop that has no PoE on it.

    • ●Filter the list by Active, PoE, or All. Each row opens the circuit path.
    • ●A row carries jack and room, VLAN, MAC, TDR length, and the directory name when the plant has them.
    • ●Watts and link speed show only when a controller pull reported them. Everything else reads Unknown instead of a guess, and 0 W means the controller really said zero.
    • ●TDR length stays typed or tester. RackLume still does not bind your directory or scrape your switches.

Wednesday, September 16, 2026

  1. this deploy

    Collector walks unknown RFC1918 neighbors

    Shop collector follows LLDP/CDP to other private-LAN switches, not only the chassis you named. Phones stay endpoint names. No WAN sweep from Plesk. No guest SSID.

    • ●Catalyst RESTCONF hops rewrite the seed URL onto a neighbor management IP after assertAllowedCollectorTarget.
    • ●Not a live switch pull on a customer street.
  2. this deploy

    Shop guide pictures are on the how-tos

    /guide Harborline PNGs are in the tree and on the plant how-tos. Did not restamp chrome. Did not restyle the rail or OG card.

    • ●Find, Floors, Lens, Closets, Phones, Cameras, Computers, Air, login, jobs, billing, account figures point at public/guide.
    • ●Restamp stays open until screenshots are actually refreshed.

Tuesday, September 15, 2026

  1. this deploy

    Demo seats per package, plus Electric + Cable

    Harborline admin still shows the whole system. Sign in has a card per package: MSP, Cable Pro, Electric Pro, and Electric + Cable. Electric-only rail is panels, drops, jobs, billing, and tickets — no floors.

    • ●Sixth package: Electric + Cable Pro at the same $99 / $35 meter. Floors, closets, and APs come back on that seat.
    • ●Tickets is on the shop rail for Electric and the combo. Harborline sample tickets.
    • ●A RackLume launch website is on the board for later. It will live on portal.racklume.com, not a fork of the Enlighten Studios homepage.

Wednesday, September 16, 2026

  1. this deploy

    Harborline demo seats match the package rail

    Sign in cards for admin, MSP, Cable Pro, Electric Pro, and Electric + Cable are live. Electric-only is panels and the bill — no floors. Tickets is on that rail.

    • ●admin@harborline.local / LanternAdmin1 sees the full system.
    • ●electric@ has Panels, Drops, Jobs, Billing, Tickets — no Floors or APs. both@ adds floors, closets, and cable.
    • ●Electric + Cable Pro is $149 / $50 on the contractor price sheet — more than Electric Pro. A separate launch website is still later.

Tuesday, September 15, 2026

  1. this deploy

    Production TypeScript build is green

    launch-changelog.tsx and the changelog store share one ChangelogEntry shape. The 4037d62 webpack build failed because the page still expected commit groups after the store rewrite. Footer, Terms, and Privacy stay public. Live hashes stay put.

    • ●4037d62 failed next build: launch-changelog imported changelogGroups / changelogCommitCount / CHANGELOG_LIVE_* after StoreFile.changelog became items[].
    • ●This deploy — ChangelogEntry lives on auth types. The launch log maps items onto commits so webpack typechecks. /terms and /privacy stay public. rsync still excludes data/.
  2. 04:06 UTC

    Powered by Enlighten Studios, Terms, Privacy

    Studio mark and link sit at the bottom of the app panel and the login frame, pointing at enlightenstudios.us. Footer lists Terms, Privacy, Launch, Contact. /terms and /privacy are public.

    • ●767b8aa 04:06 UTC · Live — Add Powered by Enlighten Studios credit to RackLume chrome.
    • ●Powered-by credit on desktop, mobile, and login. Links to enlightenstudios.us.
    • ●Legal copy on /terms and /privacy. Curl at 04:16 UTC still 307'd logged-out visitors to Sign in; this deploy lists them as public.
  3. 02:38–02:43 UTC

    Harborline company-admin vs field demo; Mail tab

    Two Harborline cards: company admin cannot open Enlighten Admin; user demo is field-only. Production mail submits to the box postfix. Mail tab shows host, port, and from.

    • ●Company-admin demo cannot open Enlighten Admin. User demo is field-only.
    • ●Production mail goes to local postfix on 127.0.0.1:25.
    • ●Admin Mail tab shows the postfix target when SMTP_HOST is set, plus the existing test-send button.
    • ●Demo cards invite a mapped-plant walk instead of leading with what the seat cannot do.
  4. 02:18–02:26 UTC

    MSP, Cable Pro, Advanced — then seat limits before upsells

    Package sits on the company (and optionally a seat) and maps onto module flags. Enlighten picks the mode on the client record. Harborline stays Advanced for sales walks.

    • ●MSP Basic is plant/Find without billing the customer from RackLume. Cable Pro is the offer (jobs, Fluke PDF, invoices). Advanced is both.
    • ●An employee who opens Jobs, Tests, or Lens sees intranet + Find copy, not a Cable Pro upsell, when that module is off for the seat.
  5. 01:53 UTC

    Login starts empty; forgot-password is real

    The form does not prefill Harborline. Tap a demo card to fill that seat. Forgot / reset mails a two-hour link. Admin is a different seat than the demo.

    • ●Email and password start empty. Harborline fills only from the demo cards.
    • ●/forgot and /reset issue a two-hour reset and mail the link.

Updates are grouped by area. Open the full log to see every entry.

Full log

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.