
Waukesha, Wisconsin · what’s new
Read about product updates and completed work. The Launch board tracks milestones, including the original mapping-service target of Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.
75 updates · latest Delete and rename floors on Floors
24 updates · latest Air and Switches update from connected systems
28 updates · latest Clearer instructions and private customer support
142 updates · latest Document and trace closet connections
20 updates · latest Keep Outfit fonts available for PDF downloads
4 updates · latest Panel-walk CSV loads a live building electrical plant
128 updates · latest RackLume branding completed
10 updates · latest Sign in with fingerprint / Face
36 updates · latest Restore Outfit typography across the portal
Friday, November 13, 2026
this repair release
The portal applies its Outfit font through an explicit root binding to the generated font metadata, restoring the intended typography after a font-class mismatch.
Thursday, October 22, 2026
this release
Account → Setup guides new and existing users through the sections included in their tier and permissions.
Tuesday, October 20, 2026
this release
Sample pages, download names and historical release updates now display the RackLume product name.
Wednesday, October 7, 2026
this ship
Login cards print RackLumeAdmin1 / RackLumeDemo1. Harborline demo seat hashes were restamped to match. Enlighten operator hash untouched.
Friday, October 2, 2026
this ship
One film. You see the floor, drop pins, point Lens at the wall, walk Air, then pick a seat. Jenny talks at a normal pace. Cartoon walkers are off Brand.
Thursday, October 1, 2026
this ship
One main film. You lay out the floor, drop the pins, then walk the hall. Lens shows what's on the wall. You do not type a port. Jenny talks slower. Seats and prices at the end.
this ship
Techs walk a real hall. Lens walks up to a wall jack. Air is a hallway walk with the heatmap on the tablet. Jenny stays.
this ship
People walk the First, Second, and Garage drawings from the account. The heatmap is the live walk. Tablets show those plans, not a smashed desktop page. Jenny stays.
this ship
The stills are gone. Techs walk across the drawings from the account. Tablets show those plans. Jenny stays. Watched before they were called ready.
this ship
One longer film walks Find, Air, Floors, Closets, Panels, and Jobs. Seat spots stay. Jenny stays. Watched before they were called ready.
this ship
The twitching cut is gone. Walks dissolve once and hold. Brand plays new filenames so the page cannot keep an old cached movie. Jenny stays.
this ship
Every finished mp4 is inspected for leftover green tablets before Brand is told they are ready. Jenny stays. Air and Floors on the tablet are the real pages.
this ship
A longer commercial walks Find, Air, Closets, Panels, and Jobs in one sitting. The short seat films stay. Jenny stays. Watched before they were called ready.
this ship
The still-frame cuts are gone. New films open with a welcome, walk techs in purple RackLume shirts, and put the real app on the tablet they are holding. Speech is rewritten to sound like a person.
this ship
The old still-image films are gone. New cuts walk a tech up to the jack or the panel. The tablet in the corner is the real portal. The voice talks like a person about what you are looking at and what each seat does.
this ship
Seven short informative films are on Brand and Promo: guide facts, 3D people doing the work, and real portal click-throughs. Longer sectioned training comes next. They are not on YouTube yet.
this ship
Instagram gets the same A as Facebook, a lockup grid square, and highlight covers. Bio and website sit in the kit. No URL on the picture.
this ship
The shop Report rail now opens four reports. Plant stays the network checklist. Clients, billing, and tickets are printable lists. This is not the Enlighten error log.
this ship
Seven short films are on Brand and Promo for review — intro plus Free, MSP, Cable Pro, Advanced, Electric Pro, and Electric + Cable. They are not on YouTube yet.
this ship
The YouTube banner is 2560×1440 with the live RackLume lockup in the strip phones and desktop keep. Trades line and Powered by Enlighten. No URL on the picture.
this ship
The first Facebook post image is a low-opacity closet — patch cords into a switch stack — with the live RackLume lockup. The link stays in the caption, not on the picture.
this ship
The Facebook page kit is the live RackLume A on navy (1080) and the wordmark cover (1640×924) with the trades line and Powered by Enlighten. Download on Brand and Promo. Neighbor calls are Michael’s — off the Need-to-do list.
Tuesday, September 22, 2026
this ship
Operator → Users on /admin/users creates a shop seat with package, username, email, first and last name. Filter the list, then edit or disable. Password hashes never appear. Team invites stay for company admins.
this ship
MSP shops get Work → Book: client info, attach shop locations, PCs from PC Agent / LAN scan, and an encrypted password vault. Hardware add stays on Systems. Secrets are AES-GCM — not plaintext in lantern.json and not in the audit log.
Saturday, September 19, 2026
this deploy
The Harborline admin login card is shop admin (Team, billing, invites), not a field tech. A Team role save had left that seat as tech. The roster now pins every Harborline login-card seat back on boot. Passwords were not rewritten.
Friday, September 18, 2026
this deploy
Three demo seats existed but their passwords were published nowhere, so trying them with the LanternDemo1 the login page prints said Wrong password. The login cards now list all nine seats, each with its own password.
this deploy
Open a closet and the switch draws the same faceplate Air uses — PoE copper, plain copper, and SFP uplinks. Under the rack there is a new Ports in this cabinet list so you can trace a live drop that has no PoE on it.
Wednesday, September 16, 2026
this deploy
Shop collector follows LLDP/CDP to other private-LAN switches, not only the chassis you named. Phones stay endpoint names. No WAN sweep from Plesk. No guest SSID.
this deploy
/guide Harborline PNGs are in the tree and on the plant how-tos. Did not restamp chrome. Did not restyle the rail or OG card.
Tuesday, September 15, 2026
this deploy
Harborline admin still shows the whole system. Sign in has a card per package: MSP, Cable Pro, Electric Pro, and Electric + Cable. Electric-only rail is panels, drops, jobs, billing, and tickets — no floors.
Wednesday, September 16, 2026
this deploy
Sign in cards for admin, MSP, Cable Pro, Electric Pro, and Electric + Cable are live. Electric-only is panels and the bill — no floors. Tickets is on that rail.
Tuesday, September 15, 2026
this deploy
launch-changelog.tsx and the changelog store share one ChangelogEntry shape. The 4037d62 webpack build failed because the page still expected commit groups after the store rewrite. Footer, Terms, and Privacy stay public. Live hashes stay put.
04:06 UTC
Studio mark and link sit at the bottom of the app panel and the login frame, pointing at enlightenstudios.us. Footer lists Terms, Privacy, Launch, Contact. /terms and /privacy are public.
02:38–02:43 UTC
Two Harborline cards: company admin cannot open Enlighten Admin; user demo is field-only. Production mail submits to the box postfix. Mail tab shows host, port, and from.
02:18–02:26 UTC
Package sits on the company (and optionally a seat) and maps onto module flags. Enlighten picks the mode on the client record. Harborline stays Advanced for sales walks.
01:53 UTC
The form does not prefill Harborline. Tap a demo card to fill that seat. Forgot / reset mails a two-hour link. Admin is a different seat than the demo.
Updates are grouped by area. Open the full log to see every entry.
Full logWaukesha
Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.