
Waukesha, Wisconsin · what’s new
Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.
74 ships · latest Floor plan sits above wall scale
21 ships · latest Air floor chips sit on the plan; Install sits under it
22 ships · latest Guide is a step-by-step book for each package
128 ships · latest Lens shows the floor plan behind the labels
17 ships · latest Invoice PDF uses Outfit and an optional shop logo
4 ships · latest Panel-walk CSV loads a live building electrical plant
123 ships · latest Portal is live on portal.racklume.com
8 ships · latest Changelog opens by area; the full log stays
14 ships · latest Enlighten admin can compose shop user accounts
Tuesday, September 22, 2026
this ship
Operator → Users on /admin/users creates a shop seat with package, username, email, first and last name. Filter the list, then edit or disable. Password hashes never appear. Team invites stay for company admins.
this ship
MSP shops get Work → Book: client info, attach shop locations, PCs from PC Agent / LAN scan, and an encrypted password vault. Hardware add stays on Systems. Secrets are AES-GCM — not plaintext in lantern.json and not in the audit log.
Saturday, September 19, 2026
this deploy
The Harborline admin login card is shop admin (Team, billing, invites), not a field tech. A Team role save had left that seat as tech. The roster now pins every Harborline login-card seat back on boot. Passwords were not rewritten.
Friday, September 18, 2026
this deploy
Three demo seats existed but their passwords were published nowhere, so trying them with the LanternDemo1 the login page prints said Wrong password. The login cards now list all nine seats, each with its own password.
this deploy
Open a closet and the switch draws the same faceplate Air uses — PoE copper, plain copper, and SFP uplinks. Under the rack there is a new Ports in this cabinet list so you can trace a live drop that has no PoE on it.
Wednesday, September 16, 2026
this deploy
Shop collector follows LLDP/CDP to other private-LAN switches, not only the chassis you named. Phones stay endpoint names. No WAN sweep from Plesk. No guest SSID.
this deploy
/guide Harborline PNGs are in the tree and on the plant how-tos. Did not restamp chrome. Did not restyle the rail or OG card.
Tuesday, September 15, 2026
this deploy
Harborline admin still shows the whole system. Sign in has a card per package: MSP, Cable Pro, Electric Pro, and Electric + Cable. Electric-only rail is panels, drops, jobs, billing, and tickets — no floors.
Wednesday, September 16, 2026
this deploy
Sign in cards for admin, MSP, Cable Pro, Electric Pro, and Electric + Cable are live. Electric-only is panels and the bill — no floors. Tickets is on that rail.
Tuesday, September 15, 2026
this deploy
launch-changelog.tsx and the changelog store share one ChangelogEntry shape. The 4037d62 webpack build failed because the page still expected commit groups after the store rewrite. Footer, Terms, and Privacy stay public. Live hashes stay put.
04:06 UTC
Studio mark and link sit at the bottom of the app panel and the login frame, pointing at enlightenstudios.us. Footer lists Terms, Privacy, Launch, Contact. /terms and /privacy are public.
02:38–02:43 UTC
Two Harborline cards: company admin cannot open Enlighten Admin; user demo is field-only. Production mail submits to the box postfix. Mail tab shows host, port, and from.
02:18–02:26 UTC
Package sits on the company (and optionally a seat) and maps onto module flags. Enlighten picks the mode on the client record. Harborline stays Advanced for sales walks.
01:53 UTC
The form does not prefill Harborline. Tap a demo card to fill that seat. Forgot / reset mails a two-hour link. Admin is a different seat than the demo.
Every ship is in one area. Nothing is removed.
Full logWaukesha
Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.