RackLume

Waukesha, Wisconsin · what’s new

What’s new.

Living log of what shipped. Launch is the deadline and the gates — charge the walk Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

Showing 3 of 411

Clear filters

Wednesday, September 16, 2026

  1. this deploy

    Board: estimate → work order → invoice

    Need-to-do card for the paid-job flow shops need: create an estimate, turn it into a work order once approved, invoice when ready. Cable / IT / Electric packages. Not Accubid takeoff.

    • ●estimate-to-wo-invoice — HIGH PRIORITY for year-end income; needed for paid jobs.
    • ●Jobs today are draft → in progress → ready to bill → billed only. No estimate/quote stage yet.
    • ●electric-estimate stays done (electrical SKUs on WOs). This card is the missing approve→WO→invoice path. Ties jobs + invoice-pdf. No Stripe.
  2. this deploy

    Board: year-end income + Lens wall proof + new-build walk

    Need-to-do cards for paid cash by end of 2026 plus Michael’s Lens wall-faceplate proof and a new-build walk after the first check. lantern-launch-tick only refreshes percents on existing cards — it does not invent new lines.

    • ●lens-faceplate-proof — HIGH PRIORITY. Wall faceplate / jack proof in Lens (not MDF/IDF rack). Michael’s original idea.
    • ●neighbor-msp-cable / print-leavebehind / first-building — Tritech + Brew City PC outreach and leave-behind. Year-end income path.
    • ●new-build-walk — AFTER FIRST CHECK. Cabler Lens-mark → floor plan → IT adds hardware/APs. free-residential-tier + residential-floors stay later.
    • ●floor-wire-path stays Need to do — pathway overlay tool NOT shipped. Tick timer does not add cards; deploy boots the stamp.
  3. this deploy

    Board: year-end income path + neighbor calls

    Need-to-do cards for first paid cash by end of 2026: real building, Tritech + Brew City PC outreach, printed leave-behind. L3 HTTPS-OUT stays the MSP wedge. Free residential / house floors wait until after the first check.

    • ●neighbor-msp-cable — Tritech (Waukesha) + Brew City PC (Oconomowoc) with Kelley / RD / Edge / Kohl / Terminal-Andrae. Neighbors, not customers yet.
    • ●print-leavebehind — lockup + Powered by Enlighten for those meetings.
    • ●first-building / plant-csv / invoice-pdf / L3 / home-hardware-overview notes refreshed for year-end income. plant-data-source and first-building stay not done.
    • ●free-residential-tier + residential-floors — after first check / commercial first building. Do not build now. No Stripe. Harborline is not a customer.

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.