Read about product updates and completed work. The Launch board tracks milestones, including the original mapping-service target of Friday, September 25, 2026. This page is the diary. Harborline is the demo plant, not a customer.

467 in the log

Bookmark with ?tag= and ?q= on this URL.

Floors

75 updates · latest Delete and rename floors on Floors

Air

24 updates · latest Air and Switches update from connected systems

Free edition

28 updates · latest Clearer instructions and private customer support

Plant

142 updates · latest Document and trace closet connections

Jobs & billing

20 updates · latest Keep Outfit fonts available for PDF downloads

Electric

4 updates · latest Panel-walk CSV loads a live building electrical plant

Site

128 updates · latest RackLume branding completed

Ops

10 updates · latest Sign in with fingerprint / Face

Close

Wednesday, October 7, 2026

  1. this ship

    Sign in with fingerprint / Face

    Turn on fingerprint or Face unlock under Account, then use it on Sign in and in the RackLume app. Same secure session as password — no second password store on the phone.

    • ●Account → Fingerprint / Face registers a passkey on this device.
    • ●Sign in shows Sign in with fingerprint / Face under the password form.
    • ●APK versionCode 16 keeps portal.racklume.com inside the WebView so the passkey prompt stays in-app.

Thursday, October 1, 2026

  1. this ship

    Stay signed in and optional 2FA

    Sign in can keep this device for 30 days. Sign up can skip or apply an authenticator. If you skip, Account turns it on later.

    • ●Stay signed in on the sign-in page. Default idle is still 12 hours.
    • ●Optional authenticator 2FA. Secrets stay out of public dumps.

Thursday, September 24, 2026

  1. this ship

    Changelog opens by area; the full log stays

    The public log and the operator log start as area cards (Floors, Air, Free edition, Plant, Jobs, Electric, Site, Ops). Open a card for every ship in that area, or Full log for the whole diary. Nothing was deleted. Field pages do not load this log.

    • ●https://portal.racklume.com/changelog — areas first. Full log is the long page.
    • ●Search, audience, and tag filters still open the matching notes. Password hashes untouched.
  2. this ship

    Signed-in pages load faster; free seats stay a house map

    After two days of new features, every signed-in click was re-running launch-board stamps and re-parsing lantern.json. That work now happens once when Node starts. Free testers with leftover shop flags see Ask to upgrade on Jobs/Billing, not a contractor ledger.

    • ●Find, Floors, Air, and the rest of the panel skip the stamp list after boot. Public /changelog is still a large page.
    • ●Free package caps Jobs, Billing, Docs, Team, Tests, and Electric even if the org row still has those flags. Harborline demo is unchanged. Password hashes untouched.

Tuesday, September 22, 2026

  1. this ship

    Work, vault, and ISP gateways survive SQL-primary

    Postgres now maps the Work book, encrypted vault rows, ISP gateways, and shop username / first / last. JSON stays live Sign in. Ciphertext only — vault.key stays on the data dir. No ISP partner API.

    • ●lantern_work_clients, lantern_vault_secrets, lantern_isp_gateways. Seat compose fields round-trip. Home tier flag on the org row.
    • ●Did not flip LANTERN_SQL_READ. Password hashes untouched. Frozen OG, rail, and Computers/Phones/Cameras lists untouched.

Sunday, September 20, 2026

  1. this ship

    Sign up for a free account

    Public /signup creates a real Free package seat: Find, Floors, Air, Switches, Computers, and Lens on one building. Jobs, Billing, Team, SOP, Fluke, and Electric Pro stay paid. Cable Pro remains the shop cash path.

    • ●free-account-signup is checked off. free-residential-tier is Doing at 70% — house breaker map stays Electric Pro.
    • ●Caps: 1 org, 1 location, 1 user, 5 computers, 2 floor plans. Complimentary — no Net 30. /coming-soon waitlist stays.
    • ●Sign up on /login and /signup. Harborline demo passwords stay on the demo card only.

Wednesday, September 16, 2026

  1. this deploy

    Sessions, logins, and idle timeout

    Enlighten and company admins can see who is signed in, a login audit, and revoke a seat. Quiet seats time out after 12 hours. Sign in still works. No passwords or hashes in the log.

    • ●Account lists this device and last seen. /admin/sessions is the operator list plus the login audit.
    • ●Idle default is 12 hours (LANTERN_SESSION_IDLE_HOURS). Revoke writes the registry; the next page signs that cookie out.
    • ●SQL-primary store, JSON backup. Did not flip dual-read off. Did not restyle frozen OG, rail, or plant lists.
  2. this deploy

    Computers, Phones, and Cameras lists are frozen

    Michael confirmed the inventory lists are correct. Deploy refuses a SUPERSET from a behind branch that would drop Plant → Computers / Phones / Cameras or revert DeviceInventory to cards. Operator → Note stays with the same restore set.

    • ●Checksums in deploy/frozen-files.sha256. scripts/check-frozen-files.sh plus deploy-production.sh abort on mismatch or a non-SUPERSET of live .deploy-sha.
    • ●Rule .cursor/rules/lantern-plant-lists-freeze.mdc. Enlighten rail lockup left to the rail agent — not frozen here.
  3. this deploy

    Restored Computers, cameras/phones lists, and the family note

    Michael was not crazy. Concurrent SUPERSET thrash wiped Plant → Computers, the DeviceInventory Phones/Cameras/Air lists, and Operator → Note from product source while another build was still live. Restored from the known-good tip. OG card freeze untouched.

    • ●Plant → Computers is back on the IT rail (MSP / Advanced). Harborline demo rows stay.
    • ●Phones, Cameras, and Air use the same list chrome again — floor, up/down, VLAN, search.
    • ●Operator → Note (/admin/projections) is back for the family projections sheet.
  4. this deploy

    Mike’s Merge click did not break the live site

    Merging a Cloud Agent draft on Origin does not rsync the Plesk VM. Publish deadline is 10px again after a later remainder rsync had put the pill back. Computers, six-port chassis, and Need-to-do cards stay. plant-data-source stays Doing.

    • ●Only #39 (Computers/MSP cards) and #30 (plant CSV export) actually landed on origin/main. The heat tree with conflict markers was never deployed.
    • ●btn-square-radius — .btn-lantern uses --radius-control (10px), not a 999px pill. Chrome test refuses the pill.
    • ●Need-to-do catalog restored (shop tickets, collector/L3, invoice email, RMM switch-in, Computers). plant-data-source stays in progress — not done.

Other

36 updates · latest Restore Outfit typography across the portal

Updates are grouped by area. Open the full log to see every entry.

Full log

Waukesha

The log stays current. The deadline stays on Launch.

Mike Cobus · Enlighten Studios. First day in this book is Tuesday, September 15, 2026. Every later ship adds a row here in the same commit.